TEPCO's Fukushima plant was built for a 5.7m tsunami — the wave was 15m
Fukushima Daiichi was designed for a 5.7m tsunami. The 2011 wave was 15m. Three reactors melted down, and 160,000 people were evacuated.
TEPCO · 2011-03-11
What happened
On March 11, 2011, a magnitude 9.0 earthquake struck off the coast of Japan, triggering a tsunami that overwhelmed the Fukushima Daiichi Nuclear Power Plant, operated by TEPCO. The plant's seawall was designed for a maximum tsunami height of 5.7 meters. The actual wave was approximately 15 meters.
The tsunami flooded the plant's backup diesel generators, which were located in basements, cutting off power to the reactor cooling systems. Without cooling, three reactors underwent meltdown, releasing radioactive material and forcing the evacuation of over 160,000 people. It was the worst nuclear disaster since Chernobyl.
The investigation found that TEPCO and Japanese regulators had ignored warnings about the risk of larger tsunamis. A 2008 internal TEPCO study had predicted a possible 15-meter tsunami, but the company did not act on it. The case illustrated how the assumption that 'it hasn't happened before' is not a safety analysis, and how regulatory capture — the close relationship between TEPCO and the regulators — can suppress the warnings that matter.
Why it happened
- The plant's seawall was designed for a 5.7m tsunami; the actual wave was 15m.
- Backup generators were in basements and were flooded, cutting off reactor cooling.
- TEPCO and regulators ignored a 2008 internal study predicting a possible 15m tsunami.
- Three reactors melted down; 160,000+ people were evacuated.
The lesson
'It hasn't happened before' is not a safety analysis. TEPCO's own study predicted the 15m wave. The cost of the seawall was millions; the cost of not building it was $200B.
Aftermath
Japan shut down all 54 nuclear reactors for safety reviews. TEPCO was effectively nationalized. The disaster accelerated Germany's decision to phase out nuclear power. The case prompted global reforms in nuclear safety, including requirements for protection against 'beyond-design-basis' events.
Sources
- NAIIC — The Official Report of the Fukushima Nuclear Accident Independent Investigation Commission (National Diet of Japan, 2012; English executive summary)
- Fukushima Daiichi nuclear disaster — Wikipedia
spotted an error? The club wants to know.
More like this
Three Mile Island's partial meltdown ended America's nuclear ambitions for 30 years
Spain and Portugal went dark for a day when the Iberian grid lost voltage control
Honda's engine software could stall the car on sudden acceleration — 294,612 recalled
Somewhere, someone solved the problem this company failed at. 2nd Opinion →

Comments · 0
Sign in to join the comments.